EPS Cement Sandwich Wall Panel Installation Guide
EPS Cement Sandwich Wall Panel Installation Guide
1.Seeting the line
2. Sawing board
3. Apply cement adhesive
4. Installation: Carrying the board to installation place, correcting the board by gavelock &making it close tightly and let the cement adhesive squeeze out into full and fixing it with a chock temporarily.
5. Correcting: Using a guiding rule of two meters to check verticality and leveling correcting
Fixing: Using 6mm diameter reinforced steel bar & construction sealant to fix
6.Grouting &filling starch:
Filling and strickling the corrected wall board with cement adhesive, filling the big gap with fine stone concrete.
7. Sticking anti-crack tape & fiberglass mesh: Stick anti-crack tape on gap of panels, then stick fiberglass mesh on whole wall, thus to prevent the wall from crack
8. Installation electrical wires, switches & waterpipes
9. Painting (sticking ceramic tile or wall papers )
10. Installation door etc
11. Soft decoration etc
12. Electrical appliance installation
Remarks: 1-6 is about wall panel installation .7-12 is about follow-up construction & decoration projects.
Danas is solely responsible for 1-6 installation content.